Methodology for optimising costs of the construction company for the management of the general object construction technology
https://doi.org/10.21285/2227-2917-2022-1-20-27
Abstract
The article describes a methodology for optimising the costs associated with managing the process of civil engineering construction during the design and implementation of the construction management plan (CMP). The general construction technology is determined by a sequence of particular activities using construction equipment and qualified executive specialists. The costs of the work performed by technical and labour resources, together with the costs for enabling these works at the construction site, compose the total costs of construction companies. These costs are covered by the cost estimation documentation of a constructed facility. This article proposes an economic and mathematical model for optimising the volume of these costs during the development and implementation of CMP sections. The developed model is used for assessing the costs associated with constructing a residential building, considering various patterns of the used technical and labour resources. Conclusions on the dynamics of changes in the costs for this building are formulated, along with the effect of construction period on the volume of construction costs.
About the Authors
V. Z. VelichkinRussian Federation
Victor Z. Velichkin - Dr. Sci. (Eng.), Professor, Peter the Great St. Petersburg Polytechnic University.
29 Politechnicheskaya St., St. Petersburg, 195251
Competing Interests:
None
M. V. Petrochenko
Russian Federation
Marina V. Petrochenko - Cand. Sci. (Eng.), Associate Professor, Peter the Great St. Petersburg Polytechnic University.
29 Politechnicheskaya St., St. Petersburg, 195251
Competing Interests:
None
I. S. Ptukhina
Russian Federation
Irina S. Ptukhina - Cand. Sci. (Eng.), Associate Professor, Peter the Great St. Petersburg Polytechnic University.
29 Politechnicheskaya St., St. Petersburg, 195251
Competing Interests:
None
A. Yu. Gorodishenina
Russian Federation
Anna Yu. Gorodishenina - Assistant, Peter the Great St. Petersburg Polytechnic University.
29 Politechnicheskaya St., St. Petersburg, 195251
Competing Interests:
None
References
1. Bulatov GYa. Towards the theory of machine productivity. Trudy SPbGTU. 2007;502:129-138. (In Russ.).
2. Antoniuk YaS. Economic efficiency estimation of constructive decision variants in building. Vestnik Brestskogo gosudarstvennogo tekhnicheskogo universiteta. Stroitel'stvo i arkhitektura. 2010;1:142-145. (In Russ.).
3. Antonyuk YaS. Methodology for assessing the economic efficiency of options for organizational decisions of the PIC. Aktual'nyye problemy ekonomiki stroitel'stva: materialy respublikanskoy nauchno-prakticheskoy konferentsii (Minsk, 25–26th April 2008). Minsk: BGTU; 2009. p. 23-34. (In Russ.).
4. Golubova OS, Kostyukova SN. Methodological foundations for assessing the effectiveness of a construction organization. Minsk: BNTU; 2019. 226 p. (In Russ.).
5. Huang X. Optimal project selection with random fuzzy parameters. International journal of production economics. 2007;106(2):513-522. https://doi.org/10.1016/j.ijpe.2006.06.011.
6. Bayramukov SH, Dolaeva ZN, Karabashev RK, Tekeev IS. Optimization of the project of the organization of construction taking into account the factors of energy consumption. Izvestiya SevKavGGTA. 2018;3(17):19-26. (In Russ.).
7. Krichevsky M, Martynova J, Dmitrieva S. Use of Neural Networks to Assess Competitiveness of Organizations. International Scientific Conference Energy Management of Municipal Facilities and Sustainable Energy Technologies EMMFT 2019. 2019;1259:72-82. https://doi.org/10.1007/978-3-030-57453-6_8.
8. Ramsundar B., Zadeh R. TensorFlow for Deep Learning. Sebastopol: O’Reilly Media, 2018. 256 p.
9. Velichkin VZ, Petrochenko MV, Strelets KI, Zavodnova EB, Gorodishenina AYu. The branch and bound method applied to the construction of residential quarters. Vestnik MGSU. 2021;16(1):91-104. (In Russ.). https://doi.org/10.22227/1997-0935.2021.1.91-104.
10. Petrochenko M, Velichkin V, Kazakov Yu, Zavodnova Ye. Reliability assessment of the construction schedule by the critical chain method. Magazine of Civil Engineering. 2018;5(81):25-31. https://doi.org/10.18720/MCE.81.3.
11. Afanas'yev VA. Stream organization of construction. Leningrad: Stroyizdat; 1990. 302 p. (In Russ.).
12. Sokolnikov VV. Modeling of organizational and technological reliability of construction. Vestnik Grazhdanskikh Inzhenerov = Bulletin of Civil Engineers. 2018;4:92-97. (In Russ.). https://doi.org/10.23968/1999-5571-2018-15-4-92-97.
Review
For citations:
Velichkin V.Z., Petrochenko M.V., Ptukhina I.S., Gorodishenina A.Yu. Methodology for optimising costs of the construction company for the management of the general object construction technology. Izvestiya vuzov. Investitsii. Stroitelstvo. Nedvizhimost. 2022;12(1):20-27. (In Russ.) https://doi.org/10.21285/2227-2917-2022-1-20-27